News & Events

Aug 17, 2020
Langley Concrete featured in Concrete Plant International
Langley Concrete's gasketed box culvert featured in International Publication
Langley Concrete's gasketed box culvert was featured in an International Publication discussing the benefits of accelerated precast construction. The article provides an overview of the Mon's Crossing pedestrian underpass project for the Resort Municipality of Whistler. The 3.6m (span) x 3.0m (rise) culvert was supplied in 1.2m lengths for an overall structure length of 30m. The entire span had to be installed in under 20 hours to allow the movement of goods by rail through the corridor.
Click here to read the article.